Planning Permission Flow

Pre-application to submission to consultation to decision to appeal. The UK planning pipeline.

A free, animated planning permission flow you can read here or embed on any website, from Scrollchart.

Planning Permission Flow

Planning Permission FlowUK residential application: 8-13 statutory weeks from submission to decisionPre-ApplicationAdvice2-4 wksSubmissionValidation1-2 wksConsultationNeighbour21 daysAssessmentOfficer4-6 wksDecision8 or 13 wksdeadlineDischargeConditions8 wksObjectionsReceivedCommitteeReferralAppealPINS / 6 mo+Grantedw/ Conditionsif objectionsif complexif refusedif approvedHouseholder apps: 8-week target. Major developments: 13 weeks. Committee referral adds 4-8 weeks. Appeal adds 6-12 months.

A planning-permission pipeline with typical durations at each step and conditional branches for objections, modifications, and appeals.

Good for

  • Development timeline and planning risk explainer articles for property investors
  • Homeowner extension and permitted development guides
  • PropTech and planning-data content explaining LPA performance metrics

Source & accuracy

This planning permission flow is an editorial illustration built to represent the concept accurately. Where it shows figures, they are typical or representative values chosen to make the relationship clear, not a single underlying dataset. The diagram and its explainer are reviewed and maintained centrally, and updated over time as understanding improves.

From enquiry to formal submission

The UK planning process begins informally with a pre-application consultation, where a developer tests concepts with the local authority before committing resources to full drawings and environmental surveys. Once ready, the formal application launches, triggering a statutory 21-day consultation window during which neighbors, utilities, and statutory bodies submit objections or support. This feedback period reshapes design details and planning officers' recommendations. The application then enters technical review where conservation officers, highways engineers, and environmental health teams examine compliance with local policy.

Decision and appeal pathways

After consultation closes, the planning officer produces a committee report recommending approval or refusal. Committee members vote, and if approval succeeds, the developer receives a formal decision notice setting conditions and time limits for commencement. If refusal occurs, or if the applicant disagrees with conditions, a right of appeal opens a quasi-judicial review by the Planning Inspectorate, adding months to the timeline. Most appeals fail unless material facts shift or procedural errors emerge. Successful outcomes require careful negotiation with the authority and understanding local policy precedent.

Embed this diagram

Add this animated planning permission flow to your own site. Copy one line of HTML, or use the embed builder for theme and sizing options.

Reference

What this is
A free, embeddable, animated planning permission flow for any website.
Who uses it
Real-estate blogs.
How to embed
Copy one line of HTML. No signup. No watermark. Works in WordPress, Webflow, Ghost, Substack, plain HTML.
File size
iframe embed, ~80 KB gzipped (loads on demand, does not block your page paint).
License
Free forever. Editorial explainer text included; updated centrally over time.

Embed format options

Copy the universal HTML snippet, the WordPress shortcode, or an iframe fallback - see the WordPress plugin page for details. Any format keeps the same Core Web Vitals profile and the same explainer text.

Embed snippet
<div data-scrollchart="planning-permission-flow" data-scrollchart-v="1"></div>
<script src="https://scrollchart.com/embed.js" async></script>

Frequently asked questions

Where can I get a free animated "Planning Permission Flow" for my website?
Scrollchart provides "Planning Permission Flow" as a free, embeddable animated diagram you can add to any website with one line of HTML. No signup is required and there is no watermark. The diagram and its explainer text are served from scrollchart.com, so the embed stays current without any maintenance on your end.
How do I add a planning permission flow to a finance or business article?
Copy the embed snippet from the Scrollchart page for this diagram and paste it anywhere in your article HTML. It is compatible with WordPress, Webflow, Ghost, Substack, and static HTML pages. No account or API key is needed.